Labin Labin, Istarska Županija, 克羅地亞
房源來自 CENTURY 21 Futura
位於Labin, Istarska Županija, 克羅地亞的待售 主頁 現在正在出售。 Labin, Istarska Županija, 克羅地亞的掛牌價為 US$780,640 。 此物業具有 5 間臥室 , 3 間浴室 , 向陽項特征。 如果位於Labin, Istarska Županija, 克羅地亞的物業不是您正在尋找的,請訪問 https://global.century21uk.com ,查看在 Labin的其他待出售的 房屋 。
更新日期: 2025年1月21日
MLS#: 101200-207
US$780,640 USD
€750,000 EUR
- 臥房5
- 浴室3
- 房屋/土地面積198m²
物業特點
主要特點
- 向陽
建築資訊
- 興建年份: 2024
- 建築物狀況: 新建築
- 類型: 向陽
其他特點
- 冷氣系統: 中央
- 暖氣系統: 電動
地區
- 物業面積: 198m²
- 土地/面積: 779m²
- 臥房: 5
- 浴室: 3
- 總臥房數: 8
物業介紹
LABIN, SURROUNDINGS, GROUND FLOOR WITH SWIMMING POOL SURROUNDED BY GREENERY
We are selling a new one-story house that is in the Roh-bau phase and is being sold completely finished as in the photos, with an area of 198 m2, consisting of two residential units.
The first residential unit with an area of 50 m2 consists of an entrance hall, a kitchen with a living room and a dining room, three bedrooms, two bathrooms, a storage room.
The second residential unit has an area of 101 m2 and consists of an entrance hall, a kitchen with a living room and a dining room, two bedrooms and a bathroom.
The house is fully equipped and furnished, built with top quality materials, thermal facade 12 cm thick, top quality ceramics and sanitary ware, aluminum carpentry with automatic blinds and mosquito nets.
The house has electric underfloor heating, a chimney with the option of installing a fireplace, and is fully air-conditioned.
The yard is landscaped and formed with an area of 779 m2, where there is a swimming pool of 34 m2, a sun deck, and a barbecue.
The house was designed and formed as a smaller resort of three similar houses that have their own entrance and access road owned only by the owners of the listed properties.
The resort is equipped with video surveillance and has a 200 m2 children's playground, which can only be used by house owners.
A very beautiful and interesting story, designed in such a way as to provide the new owner with peace, relaxation in untouched nature and yet close to all vital amenities.
Construction completion scheduled for February 2025.